Required stage checklists for independent operational cases

Configure confirmations per stage and retain the completed checklist in the process audit history.

Product update 1 min read

What changed

Process templates can define a checklist for each stage. A stage cannot advance until each requirement is confirmed. The completed item labels are recorded with the append-only transition event; later edits to the template do not rewrite the case.

How to use it

  1. Open Operations and enter process stages one per line.
  2. In Checklist, use one matching line per stage, with semicolon-separated items. An empty line means that stage has no checklist.
  3. Check every required item when completing a stage.

Good to know

  • Existing processes without checklists behave as before.
  • Server-side checks protect against skipped confirmations and stale actions, with tenant permissions enforced.
  • Checkmarks are not proof of external evidence or formal approval; document uploads and approval routing are separate work.

More from the blog

Product update

A shorter, tidier phone menu

The phone menu is no longer four screens of tiles. The section you are in stands open and every other section is one row with its icon and count. Search leads the menu and the foot is one row.

Product update

The sidebar menu is on the first screen

The welcome card and \"Worth a look\" are one row each now, section headings wear icons, and a section you open stays open. \"My messages\" left the middle of the page: its bell sits beside the voice button in the sidebar.

Product update

The "My messages" bell is back where it belongs

In the macOS skin the bell now sits in the top bar beside the mic and the other buttons, and its list opens right under it instead of taking a row of its own above the page.

Missing something?

Tell us what to build next. Most of what is announced here started as somebody’s suggestion.

Suggest a feature